Capability statement
Our services, safety system, insurance and recent projects, in two versions: one for strata and facility managers, one for builders and subcontract packages.
- IRATA Level 3
- Licence 478674C
★ 5.0 on Google (12 reviews) · IRATA Level 3 supervised · Kattsafe and Safetylink certified · $20M public liability
Download a copy
Free to print, share or attach to a tender. Pick the version for you.
Strata and facility managersDownload PDF
Builders and subcontractorsDownload PDFNeed the full compliance pack (licence, certificates of currency, sample SWMS)? Request it here and we'll email it to you.
For strata and facility managers
We inspect, repair, clean and maintain strata and commercial façades by rope access, so owners corporations and facility managers can deal with defects, leaks and anchor compliance without scaffold, without disrupting residents or tenants, and with every step documented.
- Inspect façades up close by rope access, with a photo defect report ranked by priority and a fixed-price scope.
- Trace and stop façade, window and balcony leaks with isolated water testing and sealant replacement.
- Repair cracked render and concrete spalling before it becomes a falling-object risk.
- Repaint strata and commercial façades without scaffold, using Dulux exterior and membrane systems.
- Wash façades, ledges and high-rise glass, with drains covered and wash water collected.
- Inspect, test and certify roof anchors and static lines every 12 months (AS/NZS 1891.4); install new systems.
- Respond to urgent make-safe calls 24/7: loose render, falling concrete, storm damage, active leaks.
For builders and principal contractors
We deliver the high-access part of façade rectification, painting and remedial packages as a rope access subcontractor. We work to your programme, your site rules and your WHS system, so there is no scaffold line in your tender.
- Price the rope access part of your tender within 48 hours of receiving drawings or a scope.
- Deliver façade rectification from the rope: render and concrete repairs, crack stitching, joint cut-out and resealing, penetration sealing and membrane coatings.
- Repaint and coat high elevations, light wells and hard-to-reach areas as your painting subcontractor (NSW licence 478674C).
- Investigate leaks with isolated water testing, and close them out with photo evidence for your defect register.
- Install, test and certify permanent anchors and static lines (Kattsafe, Safetylink), so maintenance access is compliant at handover.
- Provide rope access for inspections, hold points and other trades where scaffold or an EWP can't reach.
- Record every drop with before, during and after photos tied to your defect list, ready for QA and sign-off.
Working on your site
- Site inductions, white cards and pre-start meetings as standard; permits to work followed.
- SWMS written for your scope and aligned to your WHS management plan, submitted before we mobilise.
- A rescue plan written for each site, rescue kit on site, and drop zones controlled below every line.
- Crew sized to your programme, with daily progress updates to your site manager.
- EWP, swing stage or scaffold arranged with you where rope access isn't the best method.
Recent projects
- Stage 1 façade defect rectification (Builder · 4-storey residential · Mascot). Joints cut and primed; unsound render rebuilt over bonding primer; balcony pipe penetrations sealed; concrete patch repair; repaint. Units, balconies and lift protected. Rectified to AS 4654.2, AS 3600, AS 3700 and the manufacturers' specifications, with a photo report for sign-off.
- Concrete remediation, occupied building (Strata high-rise · Bankstown). Defects mapped across the affected elevations, then spalling and cracks repaired inside full-height containment netting. No scaffold; building occupied throughout; full marked-up photo record handed over.
- Façade works on a live commercial site (Trading hotel above shops · Randwick). Ledges cleared, failed render removed back to brick and patched, painting, bird spikes and mesh. Completed from the rope while the hotel traded and the footpath stayed open.
- Brick façade repairs and repaint on rope (Residential tower · Randwick). Brick repointed, render and concrete repaired, then repainted drop by drop. One even finish, no scaffold on the building.
Client names withheld; project dates, scale and references available on request. Read the full case studies.
Compliance and trust
- Tactical Height Solutions Pty Ltd · ABN 60 647 872 973
- GST registered · trading since February 2021
- NSW contractor licence 478674C (painter and decorator)
- Public and products liability $20,000,000
- Professional indemnity $1,000,000 (height safety inspection, certification and design)
- Workers compensation: icare NSW
- IRATA Level 3 supervision (IRATA 3/105481)
- All rope technicians IRATA-certified
- Kattsafe and Safetylink certified installer
- Dulux accredited painter
- Cert III in Painting and Decorating (CPC30620) · first aid and CPR · White Card
Safety system
- Written WHS management system
- Site risk assessment, and a task SWMS signed by the crew before work starts
- Rescue plan written for each site, with rescue kit on site
- Exclusion zone and drop-zone control below every line
- Harnesses, ropes and devices checked before every use; anything defective taken out of service
We work to: WHS Act 2011 and WHS Regulation 2017 (NSW) · Code of Practice: Managing the risk of falls at workplaces · AS/NZS 4488 and IRATA ICOP (rope access) · AS/NZS 1891.4 (anchor inspection) · anchors tested to AS/NZS 5532 and installed to the manufacturer's instructions.
Available on request: Certificates of currency, licence, IRATA cards, sample SWMS and rescue plan, references, project dates and scale, and project photos.
