
Rope access for builders and construction companies
Defect rectification, sealant, touch-ups, façade repairs and cleaning from the rope, to your program, with a photo close-out for every item.
- Works to your program
- Photo close-out per item
- Your client stays yours
★ 5.0 on Google (12 reviews) · NSW licence 478674C · $20M public liability · CM3 prequalified
Get a free quote
We reply the same day. ★ 5.0 from 12 Google reviews
Builders bring us in for the parts of a job that need access without scaffold: defect rectification before handover, joint and sealant work, touch-up painting and façade repairs. We work to your program, report with photos, and keep our names off your client relationship.
How we work as your subcontractor
You send the defect list or the inspector's report; we price it item by item, rig from the roof, close out each item and photograph it, and hand back a close-out register you can forward to your client or certifier. We work to your program and site rules.
- Defect listYou send the list, drawings or inspection report.
- Itemised priceA price per item or a lump sum, with access included.
- RectifyEach item fixed from the rope.
- PhotographBefore and after photos for every item.
- Close-out registerA register you can forward to your client or certifier.
Send us your defect list
Send the address and a few photos. We reply the same day, inspect for free and give you a fixed-price quote, with our insurance certificates and SWMS attached.
Prequalification and site documents
- CM3 prequalified (ID 75392)Insurance certificates supplied with quotes.
- SWMS and inductionsA site-specific SWMS and rescue plan for every job; we complete your site inductions and follow your site rules.
- IRATA Level 3 supervisionEvery rope access job is supervised by a Level 3 technician.
- NSW contractor licence 478674CPainting contractor licence; on regulated work we act under your design, licence and registration.
| Cover | Limit | Current to |
|---|---|---|
| Public and products liability | $20,000,000 | 12 Apr 2027 |
| Professional indemnity (height safety inspection, certification and design) | $1,000,000 any one claim | 18 Jun 2027 |
| Workers compensation, icare NSW | As required by law | 31 Mar 2027 |
Get it all in one email: request the compliance pack, or download the capability statement for your procurement file.
Short access visits
For one-off access on a tall building, high-rise access visits are charged by the technician-hour, with no scaffold hire.
Work builders bring us in for
- Building defect repairs: Façade defect lists closed out from the rope, with photos per item.
- Rope access façade repairs: Render, joint and façade defect repairs on rope.
- Caulking and sealing: Expansion joints, window perimeters and façade sealant replacement.
- Expansion joint repairs: Failed expansion and control joints cut out and resealed.
- Concrete cancer repairs: Spalling concrete and corroded reinforcement, repaired properly.
- Rope access painting: Repaints and touch-ups on high-rise façades, no scaffold.
- Construction cleaning: Builders cleans and post-build window and façade cleaning for handover.
- High-rise building access: Rope access to any part of a façade for engineers, glaziers and builders.
- Anchor point installation: Roof anchors and static lines, installed and certified.
Builder project
What builders and contractors say
Great team of rope technicians. Always punctual and organised with tasks we set for them. Naldo's experience on remedial jobs excels and often makes our work easier to complete.
George H. Google reviewWe have worked with Naldo and the team on numerous projects involving abseiling works and have consistently found them to be highly professional and easy to work with.
Elias A. Google reviewGreat working with the team. Professional and Safe work. Great for all Abseiling needs.
Jack B. Google reviewRequest our compliance pack
Licence, current certificates of currency, a sample SWMS and our CM3 prequalification in one email.
Questions from builders
Can you work under our licence and registration on regulated work?
Yes. On regulated work we act as your specialist rope access subcontractor, under your design, licence and registration, and follow your site rules and documentation requirements.
Do you deal with our client directly?
Only if you want us to. By default we report to you and stay out of your client relationship.
How do you price a defect list?
Item by item or as a lump sum, with access included, so you can compare it with bringing scaffold back.
Can you send photos for every item?
Yes. Every item gets a before and after photo in the close-out register.
How quickly can you start?
We reply to enquiries the same day. For most jobs we can start within 48 hours of an approved quote, subject to weather and access.
Ready for an itemised price?
Send the address and a few photos. We reply the same day, inspect for free and give you a fixed-price quote, with our insurance certificates and SWMS attached.
